热门标签

Fukushima debris removal delayed by another year

时间:1个月前   阅读:8

erc20和trc20转换www.u2u.it)是最高效的erc20和trc20转换的平台.ERC20 USDT换TRC20 USDT,TRC20 USDT换ERC20 USDT链上匿名完成,手续费低。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

最新博彩网址www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。最新博彩网址上线上最新博彩网址会员登录线路、最新博彩网址代理网址更新最快。最新博彩网址开放皇冠官方会员注册、皇冠官方代理开户等业务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

上一篇:哈希牛牛:No change in power tariff for all consumers in second half of 2022

下一篇:皇冠博彩维基百科:Former UK ambassador to Myanmar detained in Yangon

网友评论